Summary of Building Readiness as of October 5, 2020

  • Building Walk-Through Checklist

    Number of Completed Schools

    Number of In-Progress Schools

    Number of Schools with an Issue

    Percent of Completed Schools
    (Out of 125 sites)

    Partitions are in place and ready to be used (plexiglass and/or vinyl shields for work that requires closer contact than six feet or work in administrative spaces).

    112

    9

    4

    89.6%

    Windows - In schools where there is no HVAC, there is at least one window operable and/or openable in instructional spaces to ensure proper ventilation.

    123

    2

    0

    98.4%

    Sanitizing stations are available in interior (not exterior) entrance(s) & classrooms.

    122

    3

    0

    97.6%

    Signage marking circulation routes and protocols are established for student and staff entry/exit of buildings (arrival, dismissal, recess, lunch etc.) to accommodate physical distancing.

    113

    5

    7

    90.4%

    Medical waiting area/isolation room is identified. This space will not be used for any other purpose, and is confirmed appropriate (has a window and/or HVAC capacity).

    120

    2

    3

    96.0%

    Mask Breaks - Plans, protocols and designated area(s) for mask breaks are established.

    115

    4

    6

    92.0%

    Distancing - All classrooms and spaces in the school are able to be set up to support 6 feet distancing for students and staff (or plan for same).

    118

    4

    3

    94.4%

    Fogger is present with supplies and/or schedule and plan for sharing is provided.

    124

    1

    0

    99.2%

    Fire and Active Shooter Drill Plans are established and account for social distancing.

    109

    8

    8

    87.2%

    Working sinks in each restroom and/or accessible to staff and students on each floor (e.g. not only in staff bathroom): Running Water, Soap dispensers, Paper towel dispensers are functioning properly.

    117

    6

    2

    93.6%

    Waste Receptacles - Each instructional space is provided with appropriate waste receptacles.

    114

    3

    8

    91.2%